The pathway to the 10th fairway has been completed.
The Turfing Job around the 9th Fairway Bunkers is almost completed.
The pathway upto the 9th tees and down to the fairway has been completed .
Along with finishing turfing around the fairway bunkers on the 9th we still have to fix the path up from the 8th fairway , there is a lot of tidying up to do and lots of Overseeding of Roughs .