.

Welcome to The Cruden Bay Golf Links Maintenance Blog.

Thursday 8 May 2014

Fairway Overseeding April 2014

During April we were out overseeding all of our fairways with fescue , some like the picture below were still thin after last summers drought .
After using 5/8 solid tines we Overseeded with fescue then Topdressed with sand .
We got a very good strike with this method and the plan is to put some bent to the fairways with a sarrell roller at the end of May .


No comments:

Post a Comment