Over the last week or two we have had several areas where we have stripped away old slippery astro turf paths on slopes and replaced them with rubber matting.
|
The Work In Progress.
Winter Aeration has progressed well both fairways and greens have been Verti Drained.
Jim Working on The 7th Fairway 3/4 Inch Tines Stabbing Away !
On to the Greens with 1/2 inch tines.
The 7th Green Breathing After Aereation.
In preperation for winter works we have also been screening our own rootzone.
The Ultra Deck Screen Is A Great Piece Of Kit.
We have also made a start with some bunker refacing.
This is the RHS Middle bunker on the 2nd.
|
No comments:
Post a Comment