.

Welcome to The Cruden Bay Golf Links Maintenance Blog.

Friday, 2 November 2012

2nd Nov 2012


Over the last week or two we have had several areas where we have stripped away old slippery astro turf paths on slopes and replaced them with rubber matting.
The Work In Progress.

Winter Aeration has progressed well both fairways and greens have been Verti Drained.

 Jim Working on The 7th Fairway 3/4 Inch Tines Stabbing Away !

   On to the Greens with 1/2 inch tines.

 The 7th Green Breathing After Aereation.

In preperation for winter works we have also been screening our own rootzone.

The Ultra Deck Screen Is A Great Piece Of  Kit.

We have also made a start with some bunker refacing.

This is the RHS Middle bunker on the 2nd.