The gradient was lowered on the first stage of the path. The pathway was preped turfed and matted.The grass grows through the holes in the mat creating a firm anti slip surface to walk on. After several months this will look like a grass pathway.
.
Welcome to The Cruden Bay Golf Links Maintenance Blog.
Thursday, 17 November 2011
Rubber Matting On The 10th Pathway
At Cruden Bay we have done a lot of work in the last 3 winters to improve the pathways /walkways on our course changing them from gravel to grass, astroturf or rubber matting .
Heavy rain caused health and saftey issues with ruts and wash outs regularly requiring valuble labour time to repair.
The gradient was lowered on the first stage of the path. The pathway was preped turfed and matted.The grass grows through the holes in the mat creating a firm anti slip surface to walk on. After several months this will look like a grass pathway.
The gradient was lowered on the first stage of the path. The pathway was preped turfed and matted.The grass grows through the holes in the mat creating a firm anti slip surface to walk on. After several months this will look like a grass pathway.
Thursday, 20 October 2011
Revetting Bunkers
This week we have made a start at refacing/renewing the three greenside bunkers at the 17th Billin` Wallie !
Wednesday, 19 October 2011
Rubber Matting
We have recently installed rubber matting on the exit of Hamish`s Bridge.
This area gets very heavily worn and needs returfing at the end of every season, by installing rubber matting this year we will not have to returf it again saving time and labour costs!
The grass will grow through the matting and once it thickens up you wont be able to see the mat.
This area gets very heavily worn and needs returfing at the end of every season, by installing rubber matting this year we will not have to returf it again saving time and labour costs!
The grass will grow through the matting and once it thickens up you wont be able to see the mat.
Wednesday, 28 September 2011
St Olaf Greens Maintenance
Today we have started to scarify the St Olaf Greens were going about 13mm deep and taking out a lot off organic matter .After this has been removed we are overseeding and topdressing them by hand .
Thursday, 22 September 2011
Maintenance Week
We have had the main course shut from Monday to Thursday to crack on with our Autumn Greens renovations this included 15mm Solid Tining + Overseeding then Disc Seeding with the Charterhouse 804 and lastly Topdressing .
All greens approaches were either solid tined and overseeded or Hollow cored and Overseeded depending on thach levels .
Fairway Overseeding continued throughout the week .
Several wet spots around the course will be drilled and filled to aid drainage with a Post Hole Auger Loaned Very Kindly By Royal Dornoch Thanks Eoin.
All greens approaches were either solid tined and overseeded or Hollow cored and Overseeded depending on thach levels .
Fairway Overseeding continued throughout the week .
Several wet spots around the course will be drilled and filled to aid drainage with a Post Hole Auger Loaned Very Kindly By Royal Dornoch Thanks Eoin.
Friday, 16 September 2011
Overseeding Fairways
Weather this morning was perfect for seeding fairways no dew first thing and no rain forecast till late afternoon.
Friday, 2 September 2011
A Great Strike !
The two pictures below were taken before cutting in the morning and show very well what a great strike we have achieved from the latest Overseeding.
Subscribe to:
Posts (Atom)



























